How to Calculate Cubic Yards
The 324 is not a magic number. It is 27 cubic feet per yard × 12 inches per foot, folded together so you can keep depth in inches, which is how nearly everyone measures it. Written the long way:
- Measure length and width in feet. For an irregular shape, split it into rectangles and add them, or use the square footage calculator and switch this page to Square feet and depth.
- Convert depth to feet. Inches ÷ 12. Four inches is 0.333 ft; three inches is 0.25 ft.
- Multiply the three for cubic feet.
- Divide by 27 for cubic yards.
- Round up to what the supplier sells. Most sell by the whole, half or quarter yard.
Worked example: a 20 ft × 10 ft bed at 4 in deep is 20 × 10 × 0.333 = 66.7 cu ft, and 66.7 ÷ 27 = 2.47 cubic yards. Order 2.5.
How Much a Cubic Yard Covers
Coverage depends only on depth, never on the material. A yard of mulch and a yard of gravel cover exactly the same ground at the same depth; the gravel is three to seven times heavier, depending on how wet the mulch is.
| Depth | One Cubic Yard Covers | Typical Use |
|---|---|---|
| 1 in | 324 sq ft | Top-dressing a lawn, paver bedding sand |
| 2 in | 162 sq ft | Refreshing mulch, decorative stone over fabric |
| 3 in | 108 sq ft | New mulch beds, pea gravel paths |
| 4 in | 81 sq ft | Patio and sidewalk slabs, light-use gravel driveways |
| 6 in | 54 sq ft | Heavy-duty concrete driveways, heavy-use gravel driveways |
| 8 in | 40.5 sq ft | Gravel driveways for pickups and trailers |
| 12 in | 27 sq ft | Deep fill, drainage trenches |
The shortcut behind every row is 324 ÷ depth in inches. Turn it around and you get the other common question: how many yards for a given area? Square feet ÷ (324 ÷ depth). A 500 sq ft area at 3 in needs 500 ÷ 108 = 4.6 cubic yards.
Cubic Yards to Tons
Quarries and landscape yards often sell stone and sand by the ton, but you measure the job in yards. The bridge is the material’s density. These are the figures our material calculators use, so the numbers here match theirs:
| Material | Tons per Cubic Yard | Pounds per Cubic Yard | Detailed Calculator |
|---|---|---|---|
| Crushed stone, pea gravel | 1.4 | 2,800 | Gravel |
| River rock | 1.35 | 2,700 | Gravel |
| Decomposed granite | 1.5 | 3,000 | Gravel |
| Sand | 1.3 to 1.4 | 2,600 to 2,800 | Sand |
| Screened topsoil, dry to moist | 1.1 to 1.3 | 2,200 to 2,600 | Topsoil |
| Compost | 0.6 | 1,200 | Topsoil |
| Wood mulch | 0.2 to 0.5 | 400 to 1,000 | Mulch |
| Concrete, placed | about 1.96 | about 3,900 | Concrete |
Treat every one of these as typical, not exact. Soaking-wet sand can weigh 10 to 15% more than dry, moist topsoil about 18% more than dry (1.3 against 1.1), and mulch more than doubles from dry to soaked. When a supplier quotes by the ton, ask what their material weighs per yard: they know, because they weigh it every day. For concrete, the figure comes from about 145 lb per cubic foot × 27.
Weight also matters for getting it home. A yard of gravel is about 2,800 lb, which is more than many half-ton pickups are rated to carry. Check the payload on the sticker in your door jamb before you load up; stone usually makes more sense delivered.
Unit Conversions
| Unit | Equals | Also Equals |
|---|---|---|
| 1 cubic yard | 27 cu ft | 0.7646 m³ |
| 1 cubic foot | 0.0370 cu yd | 0.0283 m³ |
| 1 cubic meter | 1.308 cu yd | 35.31 cu ft |
| 1 square yard | 9 sq ft | area, not volume |
| 1 US short ton | 2,000 lb | 0.907 metric t |
The metric factor is exact by definition: the international yard is 0.9144 m, so a cubic yard is 0.9144³ = 0.764555 m³. The US ton on a delivery ticket is the short ton of 2,000 lb, not the 2,204 lb metric tonne.
Mistakes That Put Yards Out
- Leaving depth in inches. 20 × 10 × 4 = 800, and 800 ÷ 27 = 29.6 “yards” is twelve times too much. Either divide inches by 12 first or divide the whole thing by 324.
- Dividing by 9 instead of 27. Nine converts square feet to square yards. Volume needs 27.
- Measuring compacted depth and ordering loose. A 4 in compacted gravel base needs roughly 5 in of loose stone. The gravel calculator has a compaction allowance built in.
- Treating dug soil like the hole. Excavated soil swells, from about 10% for sand and gravel to 40% for some clays. The excavation calculator converts hole volume to truck volume.
- Assuming a ton is a yard. For gravel a ton is about 0.7 yards; for mulch a ton is two to five yards.
- Averaging an uneven depth by eye. On a sloped bed, measure depth at several points and use the average, not the deepest or shallowest.
Frequently Asked Questions
How do I calculate cubic yards?
Multiply length × width × depth in feet to get cubic feet, then divide by 27, because a cubic yard is 3 ft × 3 ft × 3 ft. Depth is usually measured in inches, so divide it by 12 first. A 20 × 10 ft area at 4 in deep is 20 × 10 × 0.333 = 66.7 cu ft, and 66.7 ÷ 27 = 2.47 cubic yards.
How many cubic feet are in a cubic yard?
27. A yard is 3 ft, and a cubic yard is 3 × 3 × 3 = 27 cubic feet. It is the conversion people most often get wrong, because a square yard is only 9 square feet. To go from cubic feet to cubic yards, divide by 27; to go back, multiply by 27.
How many square feet does a cubic yard cover?
It depends only on depth: 324 ÷ depth in inches. One cubic yard covers 324 sq ft at 1 in, 162 sq ft at 2 in, 108 sq ft at 3 in, 81 sq ft at 4 in and 54 sq ft at 6 in. The material makes no difference to coverage; it only changes the weight.
How many tons are in a cubic yard?
That depends on the material, so there is no single answer. Crushed stone and pea gravel run about 1.4 tons per cubic yard, sand about 1.35, dry screened topsoil about 1.1, compost about 0.6 and wood mulch only 0.2 to 0.5. Placed concrete is close to 2 tons. Moisture shifts all of these, so confirm the figure with the supplier who is weighing your load.
How do I convert tons to cubic yards?
Divide the tons by the material’s density in tons per cubic yard. Five tons of crushed stone at 1.4 tons per yard is 5 ÷ 1.4 = 3.57 cubic yards. Choose Tons of material in the calculator above to do it the other way round from the usual.
How big is a cubic yard?
A cube 3 ft on each side, about waist high. In a wheelbarrow, a standard 6 cu ft contractor barrow carries roughly 3 to 4 cu ft of stone or soil comfortably, so a yard is seven to nine loads. A full-size pickup bed holds roughly 2 to 3 cubic yards of mulch by volume, but only a fraction of a yard of stone before it reaches the payload limit.
How do I convert cubic meters to cubic yards?
One cubic meter is 1.308 cubic yards, and one cubic yard is 0.7646 cubic meters. So 2 m³ is 2.62 cu yd. The factor comes from the yard being defined as exactly 0.9144 m; cube it and you get 0.764555 m³.
Should I round up when ordering cubic yards?
Yes. Suppliers sell in whole, half or quarter yards and many have a minimum order, so round up rather than to the nearest. For material that compacts, such as a gravel base, order more again: measured compacted depth needs more loose stone to fill it. The gravel calculator adds that compaction allowance for you.
Is a yard of dirt the same as a yard of the hole I dig?
No. Soil swells when you dig it, from about 10% for sand and gravel up to 40% for some clays, so a 10 cu yd hole produces roughly 11 to 14 cu yd of loose material in the truck. This page converts a volume; it does not know whether that volume is in the ground or in a pile. For haul-away, use the excavation calculator, which applies swell.
How many cubic yards of concrete do I need?
The arithmetic is identical, but concrete brings its own rules: slab thickness, a waste allowance and the choice between bags and a truck. The concrete calculator handles slabs, footings, columns and steps, and tells you when bagged mix stops making sense.
Sources & Standards
- NIST Guide to the SI (SP 811), Appendix B.9 — Conversion factors: cubic yard to cubic meter, cubic foot to cubic meter, short ton to kilogram
Estimates for planning only. Quantities are calculated from standard coverage and yield figures, with a waste allowance where the page states one. Always confirm against the manufacturer figures on the product you buy, and check local requirements before ordering. See our full method and assumptions.