πŸ“ Patio & Paver Details
ft
ft
sq ft
Nominal face size; the joint is already allowed for
in
in
Sets the base depth and paver thickness
in
4–6 in for foot traffic, 8–12 in for vehicles
linear ft
Leave blank to use the perimeter β€” subtract any edge against a house or wall
$
Leave blank to skip cost
βœ“ Results
Patio area 192 sq ft
Pattern waste allowance 10 sq ft (5%)
Coverage to buy 202 sq ft
908 pavers
Pavers to Buy
Pavers per square foot 4.50
Total excavation depth 7.4 in
Base gravel, compacted volume 2.4 cu yd
Base gravel to order (loose) 3.0 cu yd
Base gravel weight 4.1 tons
Bedding sand, 1 in screeded 0.6 cu yd
Bedding sand weight 0.8 tons
Bedding sand if bagged 32 bags (0.5 cu ft)
Polymeric joint sand 2 bags (50 lb)
Edge restraint 56 linear ft (7 sections of 8 ft)
Edging spikes (10 in) 56 spikes
Estimated paver cost β€”

Order the base gravel as crusher run, not washed stone β€” washed stone never locks together.

Buying the base stone separately, or building a gravel drive first?

Use our Gravel Calculator β†’

Paver Install Tools

πŸ› οΈ

Plate Compactor (rent β€” 3,000+ lb force)

πŸ“

Screed Rails (1 in EMT conduit or screed pipe)

πŸ”ͺ

Angle Grinder or Wet Saw with Diamond Blade

πŸ”¨

Rubber Mallet & Paver Edging Spikes

Tools worth having for this job. We don’t currently earn commission on these β€” they’re suggestions, not sponsored links.

How to Calculate How Many Pavers You Need

Pavers are priced by the square foot but ordered by the piece, so every estimate runs the same three steps: measure the area, add waste for cuts, then multiply by the number of pavers in a square foot.

Pavers = Area Γ— (1 + waste %) Γ— Pavers per sq ft, rounded up

Pavers per square foot comes straight from the face size: divide 144 by the paver's length in inches times its width in inches. A 4 Γ— 8 in Holland paver is 32 square inches, and 144 Γ· 32 = 4.5 pavers per square foot. That single number does more work than anything else on this page.

Paver SizeFace AreaPavers per Sq FtSq Ft per 100 Pavers
4 Γ— 8 in (Holland)32 sq in4.5022 sq ft
6 Γ— 6 in36 sq in4.0025 sq ft
6 Γ— 9 in54 sq in2.6737 sq ft
8 Γ— 8 in64 sq in2.2544 sq ft
6 Γ— 12 in72 sq in2.0050 sq ft
12 Γ— 12 in144 sq in1.00100 sq ft
16 Γ— 16 in256 sq in0.56178 sq ft
12 Γ— 24 in288 sq in0.50200 sq ft
24 Γ— 24 in576 sq in0.25400 sq ft

Use the nominal size, not the measured size. A "4 Γ— 8" paver actually measures closer to 3 7/8 Γ— 7 7/8 inches. The missing eighth is the joint, and the nominal figure already accounts for it. Measuring the paver with a tape and dividing by that number over-orders by about 5%.

Buying a blended or multi-size kit? The pallet is sold by coverage in square feet, not by piece count β€” order the square footage including waste and ignore the piece math entirely.

Measuring an odd shape first? Break it into rectangles with our square footage calculator and add them together.

On this page

  1. How to Calculate How Many Pavers You Need
  2. Base Depth: The Number That Decides Whether It Lasts
  3. Bedding Sand: One Inch, Screeded, Never Thicker
  4. Joint Sand, Edging and the Rest of the Order
  5. Patterns, Waste and What Each One Costs You
  6. Building It: Order of Operations and What Goes Wrong
  7. Frequently Asked Questions

Base Depth: The Number That Decides Whether It Lasts

The base is the patio. Pavers are just the wearing surface β€” everything about whether the finished job stays flat is decided under it. The base course is compacted crushed stone with fines in it (crusher run, #411, quarry process, ABC β€” the name changes by region), not washed drainage stone like #57, which never locks together.

ApplicationCompacted Base DepthPaver ThicknessTotal Excavation
Walkway or garden path4 in2 3/8 in (60 mm)7 3/8 in
Patio, foot traffic4–6 in2 3/8 in (60 mm)7 3/8 – 9 3/8 in
Patio over clay or in freeze-thaw6–8 in2 3/8 in (60 mm)9 3/8 – 11 3/8 in
Driveway, cars and light trucks8–10 in3 1/8 in (80 mm)12 1/8 – 14 1/8 in
Driveway over clay or freeze-thaw10–12 in3 1/8 in (80 mm)14 1/8 – 16 1/8 in
RV pad or delivery truck traffic12 in+3 1/8 in (80 mm)16 1/8 in+

Total excavation depth is base + 1 in of bedding sand + the paver thickness. Get that number before you rent the excavator, because digging deeper later means re-doing the whole cut.

Two things that change the depth

Ordering base stone

Crusher run loses roughly 20 to 25% of its volume when compacted, so the calculator adds a 25% allowance and converts at 1.4 tons per loose cubic yard. A compacted 4-inch base under a 192 sq ft patio is 2.4 cubic yards in place, which means ordering about 3 cubic yards or 4.1 tons.

The 324 divisor does the volume work: (square feet Γ— depth in inches) Γ· 324 = cubic yards. It comes from 27 cubic feet in a yard times 12 inches in a foot. Our gravel calculator has the full grade-by-grade breakdown if you are buying base stone for more than this one job.

Bedding Sand: One Inch, Screeded, Never Thicker

This is the single most common failure on a DIY paver patio, and it is worth being blunt about: the sand bed is 1 inch and only 1 inch. Not two, not three, and never "however much it takes to level things out."

Sand does not compact into a structural layer. It behaves like a fluid under load. A 1-inch layer has nowhere to go, so it holds. A 3-inch layer migrates sideways under wheel and foot loads, and the pavers above it sink in exactly the pattern of the traffic. Every rutted, wavy paver patio you have ever seen was bedded on too much sand.

Bedding sand cu yd = Area Γ· 324  (a flat 1 inch deep)

Use concrete sand (ASTM C33) β€” coarse, washed, sharp-edged. Do not use mason sand, which is too fine and stays soft, and do not use play sand, which is fine, round and washed of everything that gives it grip. Our sand calculator covers the differences between the types in detail.

How to get it flat

  1. Compact the base first, in lifts. Three to four inches at a time, water it lightly, run the plate compactor until the stone stops moving. A 6-inch base is two lifts, not one.
  2. Check the base for flatness, not the sand. If the base has a low spot, fix it with more stone and re-compact. Sand is not a levelling compound.
  3. Lay 1-inch screed rails β€” 1 in EMT conduit or purpose-made screed pipe β€” on the compacted base, set to the finished slope.
  4. Pull a straight board across the rails to strike the sand off level with them.
  5. Lift the rails and fill the grooves with sand, smoothing by hand.
  6. Do not compact the sand and do not walk on it. Screed it, lay pavers straight onto it, and work off the pavers you have already set.
  7. Compact after the pavers are down, with a rubber pad or a layer of joint sand on the plate to avoid chipping faces. That pass beds the pavers about 1/8 to 1/4 in into the sand β€” which is why the screed sits slightly proud of finished height.

Slope before anything else. A paver surface needs at least 1/8 inch of fall per foot away from the house, and 1/4 inch per foot is better. Build the slope into the subgrade and carry it through the base and the sand β€” never try to create it in the bedding layer.

Joint Sand, Edging and the Rest of the Order

Pavers are usually about 70% of the material bill. These are the items that get forgotten at the yard and then hold the job up for a day.

Polymeric joint sand

Polymeric sand is graded sand with a binder that sets when watered, locking the joints, shedding water and keeping weeds and ants out. Coverage depends almost entirely on joint width, and the spread between narrow and wide joints is enormous.

Joint WidthTypical PaverSq Ft per 50 lb BagBags per 200 Sq Ft
About 1/8 inStandard interlocking pavers, tight-laid80–100 sq ft2–3
About 1/4 inTumbled or chamfered pavers60–80 sq ft3–4
About 3/8 inSlab pavers, wide-joint layouts40–55 sq ft4–5
1/2 in and upFlagstone, irregular stone20–30 sq ft7–10

Joint depth matters as much as width β€” the joint should be filled to within about 1/8 in of the surface, and a 3 1/8 in driveway paver holds far more sand than a 2 3/8 in patio paver at the same joint width. The figures on the bag are the ones to trust; the calculator uses the middle of each band above.

Polymeric sand is unforgiving about two things. The pavers must be bone dry when you sweep it in, and every grain must be blown off the faces before you water β€” a haze of set polymer on the surface does not come off. Water it in the exact stages the bag describes, and do not do it with rain forecast in the next 24 hours.

Edge restraint

Edge restraint is not optional. Without it the perimeter pavers walk outward, the joints open, and the field loses its interlock from the edge inward. Plastic paver edging comes in 8 ft straight sections and 6 ft flexible sections for curves, spiked with 10 or 12 in galvanised spikes.

Setting the patio against a fence line? Our fence calculator handles post spacing, and the concrete calculator covers a poured edge or landing.

Patterns, Waste and What Each One Costs You

Waste is not padding. It is the material that leaves the site as offcuts, and the pattern you choose sets it before the first paver is laid.

PatternWaste to AddDifficultyWhy
Running bond / stack bond5%EasiestStraight cuts at two edges only
Basketweave5%EasyModular; almost no field cuts
Herringbone, 90Β°8%ModerateEvery perimeter paver is cut
Herringbone, 45Β°10%HarderEvery perimeter cut is an angle
Diagonal (45Β°) lay10%ModerateAngled cuts on all four edges
Circle kit or curved edges15%HardestRadius cuts waste large offcuts
Random / multi-size blend10%ModerateSold by coverage; harder to place efficiently

45-degree herringbone is the right answer for a driveway, and it is worth the extra cutting. Interlock in a paved surface comes from load being transferred sideways through the joints, and herringbone is the only common pattern where no continuous joint line runs in the direction of traffic. Running bond under vehicles creeps; herringbone does not.

Two rules that override the table: long narrow shapes need more waste than square ones because there is more perimeter per square foot, and order every paver in one delivery. Concrete pavers are batch-dyed and a pallet bought a month later is often visibly off-colour, with no way to fix it once laid.

What it costs

ItemTypical CostNotes
Concrete pavers$3–$8 per sq ftPremium and permeable run higher
Clay brick pavers$5–$12 per sq ftColour is fired in, so it never fades
Base stone (crusher run)$25–$50 per ton deliveredAbout 1.75 tons per compacted cu yd
Bedding sand (concrete sand)$25–$45 per ton deliveredRoughly 0.8 tons per 200 sq ft
Polymeric sand$25–$40 per 50 lb bagThe most-underestimated line item
Paver edging + spikes$2–$4 per linear ftPlastic; concrete toe costs more
Geotextile fabric$0.20–$0.50 per sq ftEssential over clay
Plate compactor rental$70–$110 per dayRent it. Hand tamping does not work.
Professional installation$15–$30 per sq ft totalExcavation and disposal included

The honest DIY figure for a mid-range patio is $8 to $14 per square foot in materials once base, sand, edging and rental are counted β€” usually about double what people budget after pricing only the pavers.

Building It: Order of Operations and What Goes Wrong

  1. Call 811 before you dig. Free, and required. Utility locates take a couple of days, so start here.
  2. Lay out the shape and mark the excavation 6–12 in wider than the finished patio on every free edge, so the edging has base to spike into.
  3. Set your slope with string lines β€” 1/8 to 1/4 in per foot, always away from the house β€” before you cut a single spade.
  4. Excavate to full depth (base + 1 in sand + paver thickness) and compact the subgrade itself. Stockpile the topsoil rather than paying to haul it β€” a 200 sq ft patio yields several cubic yards of it, and our topsoil calculator tells you what that is worth spread on the beds.
  5. Lay geotextile fabric over the subgrade on clay or soft soil, lapping seams 12 in.
  6. Place the base in 3–4 in lifts, lightly damp, compacting each lift until the plate stops sinking. Check slope on every lift, not just the last one.
  7. Screed 1 in of concrete sand off rails set to the finished slope. Do not compact it, do not walk on it.
  8. Lay pavers from a fixed straight edge β€” the house wall or a string line β€” working forward off the laid surface. Set them straight down, never slid into place, or you plough sand into the joints.
  9. Cut the perimeter last, all in one session, with a diamond blade. No cut piece should be smaller than about a third of a paver.
  10. Install edge restraint tight against the pavers and spike it off.
  11. Sweep in polymeric sand, blow the faces clean, compact, top up the joints, then water in the stages the bag specifies.

Mistakes to Avoid

Doing a driveway rather than a patio? Compare the build against a gravel driveway or a poured concrete driveway before committing β€” the base work is similar but the surface cost is not.

Frequently Asked Questions

How many pavers do I need per square foot?

Divide 144 by the paver’s length in inches times its width in inches. A 4 Γ— 8 in paver is 32 square inches, so 4.5 pavers per square foot. A 6 Γ— 6 is 4.0, an 8 Γ— 8 is 2.25, and a 12 Γ— 12 is exactly 1.0. Use the nominal size β€” the joint is already allowed for.

How deep should a paver base be?

4 to 6 inches of compacted crushed stone for foot traffic β€” patios, walkways, pool decks β€” and 8 to 12 inches for anything vehicles drive on. Add about 2 inches over clay soil or in a freeze-thaw climate. The base must be compacted in 3 to 4 inch lifts; one thick lift leaves the bottom loose.

How much sand do I need under pavers?

Exactly 1 inch, screeded flat. That is area divided by 324 in cubic yards β€” a 200 sq ft patio needs about 0.62 cubic yards, or roughly 0.8 tons of concrete sand. Never use more sand to make up for an uneven base; fix the base instead.

Why can the sand bed only be one inch thick?

Because sand does not compact into a structural layer β€” under load it moves sideways. One inch has nowhere to go. Two or three inches migrates, and the pavers above it sink in the exact pattern of the traffic. A thick sand bed is the most common cause of a wavy, sunken paver patio. Depth belongs in the base, not the bedding.

What kind of sand goes under pavers?

Concrete sand, ASTM C33 β€” coarse, washed and sharp-edged so the grains lock. Do not use mason sand, which is too fine and stays soft under load, and definitely not play sand, which is fine and round. Some contractors use #8 or #9 washed chip stone instead for open-graded permeable builds.

Can I use sand instead of gravel for a paver base?

No. Sand has no load-bearing capacity β€” it is a levelling layer, not a base. A patio built on 4 inches of sand will rut and settle within a season. The base has to be angular crushed stone with fines (crusher run, #411, quarry process) compacted in lifts, with just the 1-inch sand bed on top.

Should I use washed stone or crusher run for a paver base?

Crusher run β€” crushed stone that still contains its fines and stone dust, sold as #411, quarry process, or ABC depending on your region. The fines fill the voids so the material compacts into a hard layer. Washed stone like #57 has the fines screened out and never locks together; it is a drainage stone, not a base.

How much polymeric sand do I need?

A 50 lb bag covers roughly 80 to 100 sq ft at 1/8 in joints, 60 to 80 sq ft at 1/4 in, 40 to 55 sq ft at 3/8 in, and only 20 to 30 sq ft on flagstone with joints of 1/2 in or wider. Thicker pavers hold more sand at the same joint width, so driveway pavers use more than patio pavers.

Do I need edge restraint for a paver patio?

Yes, on every free edge. Without it the perimeter pavers walk outward, joints open, and the field loses interlock from the edge inward. Plastic edging comes in 8 ft straight sections spiked every 12 inches, or every 6 inches on curves. The base must extend 6 to 12 inches past the pavers so the spikes go into stone, not soil.

How much extra should I order for cuts and breakage?

5% for running bond or basketweave, 8% for 90-degree herringbone, 10% for 45-degree herringbone or a diagonal lay, and 15% for circle kits and curved edges. Long narrow shapes need more than square ones. Order it all in one delivery β€” pavers are batch-dyed and a later pallet often does not match.

How deep do I need to excavate for a paver patio?

Base depth plus 1 inch of sand plus the paver thickness. For a standard patio that is 4 in base + 1 in sand + 2 3/8 in paver = about 7 3/8 inches. A driveway with a 10 in base and 3 1/8 in pavers needs about 14 inches. Dig 6 to 12 inches wider than the finished edge too.

What slope does a paver patio need?

A minimum of 1/8 inch of fall per foot, and 1/4 inch per foot is better β€” always away from the house. Over 12 feet that is 1.5 to 3 inches of drop. Build the slope into the subgrade and carry it through the base and the screed rails. Never try to create slope in the sand bed.

Do I compact the bedding sand before laying pavers?

No. Screed it, then lay pavers straight onto the loose sand, working off the surface you have already laid. Compaction happens after the pavers are down, with a rubber pad or a layer of joint sand on the plate. That pass beds the pavers about 1/8 to 1/4 inch, which is why the screed should sit slightly proud of finished height.

How many pavers are on a pallet?

For 4 Γ— 8 in Holland pavers, a pallet is typically 105 to 120 square feet, which is roughly 480 to 540 pieces, weighing 3,000 to 4,000 lb. Counts vary by manufacturer and by paver thickness, so buy by square footage and let the yard work out the pallets. Plan for delivery placement β€” a loaded pallet needs a forklift or a boom truck.

Estimates for planning only. Quantities are calculated from standard coverage and yield figures and include a waste allowance. Always confirm against the manufacturer figures on the product you buy, and check local requirements before ordering. See our full method and assumptions.