πŸ“ Slab and Bar Details
ft
The long side of the pour.
ft
The short side.
Take the spacing from your drawing or local code, not from a default.
The number is the diameter in eighths of an inch: #4 is 4/8, or 1/2 in.
in
How far the steel stops short of each edge. Cover is a code value — confirm it for your pour.
What your supplier sells. Runs longer than this have to be lapped.
βœ“ Results
Bars Running the Width 14 bars × 19.5 ft
Bars Running the Length 14 bars × 19.5 ft
546 linear ft
Total Rebar
Stock Bars to Buy 28
Estimated Weight 365 lb
Grid Intersections (tie wire) 196
Lap Splices Needed None - each run fits one bar

Order the steel and the concrete off the same dimensions.

Work out the concrete volume β†’

On this page

  1. How to Work Out Rebar for a Slab
  2. Rebar Sizes and Weights
  3. Cover, Chairs and Laps
  4. Rebar Mistakes to Avoid
  5. Frequently Asked Questions

How to Work Out Rebar for a Slab

A mat of rebar is two sets of parallel bars at right angles. You count each direction separately, and the arithmetic is the same both times.

  1. Take the slab dimension and subtract the cover twice — once for each edge. A 20 ft slab with 3 in cover has 234 in of steel across it, not 240.
  2. Divide by the spacing. 234 ÷ 18 = 13 spaces.
  3. Add one. Thirteen spaces means fourteen bars. This is the step people miss, and it always errs short.
  4. Each of those bars runs the other way, and is cut to that dimension less its own cover — 19.5 ft here.
  5. Repeat for the second direction, then add the two totals.

For the 20 × 20 ft slab: 14 bars each way at 19.5 ft = 546 linear feet, about 365 lb in #4, with 196 intersections to tie.

Stock bars are counted run by run, not by dividing the total by the bar length. Each 19.5 ft run here takes one 20 ft bar, so 28 bars. On a 12 × 12 ft slab at 12 in, the 24 runs are 11.5 ft long: each still takes a whole 20 ft bar, because the 8.5 ft offcut cannot make another run, so the answer is 24 bars, not the 14 that 276 ÷ 20 suggests. Runs short enough to fit two to a bar share one. A run longer than the stock bar takes two or more bars joined by a lap splice.

What the calculator will not do is pick the bar size, the spacing or the cover. Those three come from a drawing, an engineer or your local code, and they depend on load, soil, slab thickness and what the slab carries. Enter what is specified for your pour.

Rebar Sizes and Weights

Bar size is the diameter in eighths of an inch — a #4 is 4/8, or 1/2 in. The unit weights are properties of the bar, so unlike spacing and cover they are safe to publish:

BarDiameterWeight per FootWeight of a 20 ft BarBars per Ton (20 ft)
#33/8 in0.376 lb/ft7.5 lb266
#41/2 in0.668 lb/ft13.4 lb150
#55/8 in1.043 lb/ft20.9 lb96
#63/4 in1.502 lb/ft30.0 lb67

Weight matters more than people expect on a DIY pour. The 546 linear feet above is around 365 lb of steel in #4, and it arrives as 28 separate 20 ft bars that have to be carried, cut and tied before any concrete turns up.

Cover, Chairs and Laps

Three things decide whether the steel you paid for does its job.

Cover is the concrete between the bar and the surface. Too little and moisture reaches the steel; rust takes up more room than steel does, and the slab splits from the inside. Cover is a code value and differs between concrete cast against earth, concrete exposed to weather, and concrete protected inside — use the figure for your situation.

Chairs hold the mat at that height. Steel laid on the subgrade and hooked upward during the pour is how a lot of slabs end up reinforced in name only: the bar drifts back down, finishes with no cover beneath it, and sits at a depth where it does nothing. Set the mat on chairs or dobies before the truck arrives.

Laps join bars end to end where a run is longer than the stock length. The bars overlap so the load transfers between them through the concrete. Lap length depends on bar size, concrete strength, coating and bar position, which makes it an engineering value rather than a rule of thumb — this calculator flags when a run needs a splice, and deliberately leaves the extra length out of the material figure for you to add from your drawing.

Rebar Mistakes to Avoid

Frequently Asked Questions

How do I calculate how much rebar I need for a slab?

Work each direction separately. Take the slab dimension, subtract the cover at both edges, divide by the spacing, and add one — that is the bar count for that direction. Each of those bars runs the other dimension, less its cover. A 20 × 20 ft slab at 18 in on center with 3 in cover gives 14 bars each way at 19.5 ft, so 546 linear feet in total.

What do the rebar numbers mean?

The number is the bar diameter in eighths of an inch. A #4 bar is 4/8 — half an inch. A #3 is 3/8 in, a #5 is 5/8 in and a #6 is 3/4 in. It is the simplest naming convention in construction and it catches people out constantly, because nothing else on a site is sized that way.

What size rebar do I need for a slab?

That is a structural question and this page will not answer it. Bar size, spacing and cover come together from a drawing, an engineer, or the table your local code adopts — they depend on the load, the soil, the slab thickness and what is on top of it. Enter what your drawing specifies; the calculator works out quantity, not design.

How much does rebar weigh?

Per linear foot: #3 is 0.376 lb, #4 is 0.668 lb, #5 is 1.043 lb and #6 is 1.502 lb. These are properties of the bar, not design choices, so they are safe to quote. The 546 linear feet in the example above comes to about 365 lb in #4 — worth knowing before you work out how it gets from the truck to the forms.

Why add one bar to the count?

Because dividing gives the number of spaces, not bars. A run with thirteen 18 in gaps has fourteen bars, the same way a fence with three gaps has four posts. It is an easy error to make in a rebar take-off, and it always errs short.

What is rebar cover and why does it matter?

Cover is the concrete between the steel and the surface, and it is what stops the bar rusting. Rust occupies more volume than steel, so a bar with too little cover eventually splits the slab from the inside. Cover requirements are code values and differ for concrete cast against earth, exposed to weather, or protected inside — take yours from the code, and support the bars on chairs so they stay there during the pour.

Do I need to lap rebar, and by how much?

Whenever a run is longer than the bar you can buy, yes. The two bars overlap so the force transfers from one to the other through the concrete. Lap length is a code and engineering value — it depends on bar size, concrete strength, bar coating and position — so take it from your drawing rather than a rule of thumb. This calculator tells you when a run needs a splice but deliberately does not add a lap length to the material figure.

How much tie wire do I need?

One tie at every intersection where the two directions cross, which the calculator counts for you — 196 on the 20 × 20 ft example. In practice many crews tie every other intersection in the field and every one around the perimeter, which still holds the mat together while the pour goes in. A 3-1/2 lb roll of 16-gauge wire ties a lot of intersections; buy by the roll and keep the offcuts.

Should rebar sit on the ground?

No, and this is how a lot of slabs get reinforced in name only. Steel laid on the subgrade and "pulled up" during the pour almost never ends up where it should, which leaves it with no cover underneath and no useful depth. Set the mat on chairs or dobies at the specified height before any concrete arrives.

Rebar or wire mesh for a slab?

They do different jobs. Welded wire mesh is crack-control reinforcement for a slab on grade; rebar is structural reinforcement that carries tension. Which one your slab needs, and in what size, is on the drawing. A patio and a footing are not the same problem, and substituting mesh where bar is specified is not a saving.

How many bars of rebar are in a ton?

Divide 2,000 lb by the weight per foot and then by the bar length. In 20 ft #4 bar, each bar weighs about 13.4 lb, so a ton is roughly 150 bars. In #5 it is about 96 bars, and in #3 about 266. Useful when a supplier quotes by weight but you are thinking in pieces.

How much concrete goes with that slab?

Work it out on our concrete calculator — a 20 × 20 ft slab at 4 in is 4.94 cubic yards. Order the steel and the concrete off the same set of dimensions so the two agree, and remember the rebar has to be tied and inspected before the truck arrives, not while it is waiting.

Sources & Standards

Estimates for planning only. This calculator sizes material quantities. It does not size structural members, verify load paths, or confirm compliance with the code in your jurisdiction. Local requirements β€” frost depth, footing sizes, permits, and inspections β€” override anything here. Check with your local code enforcement office or building department before you build. They are the authority that inspects and signs off the work, they amend the model codes, and what they say overrides any figure on this page. For structural or safety-critical work, have the design checked by a licensed engineer or contractor as well. See our full method and assumptions.